Reminder: CVC bridge connector project begins today

May 19, 2017  //  FOUND IN: Updates & Resources

Don't forget, the final of two projects associated with the Frankel Cardiovascular Center is now underway!

The work requires the bridge connector walkway on floor 2 (between CVC and the Cancer Center) to be closed temporarily.

The facility work is needed to meet current building regulatory requirements.

During the duration of the project, it will not be possible to maintain any traffic, personnel or equipment passing through the connector. However, signage will be posted to direct people to alternate routes and paper maps will be provided. Volunteers will also assist with wayfinding.

Here is what you need to know:

CVC floor 2 bridge connector closed to the Cancer Center

When: Through 5 a.m., Tuesday, May 30

Alternative route: Floor B1 connector between CVC and University Hospital

Thank you for your patience and cooperation!

RELATED STORIES