Wall St. Parking Structure project

June 28, 2016  //  FOUND IN: Updates & Resources

A project to install floor drains within the two elevator/stairwells in the Wall St. parking structure is scheduled as follows:

Friday, July 1, 7 a.m. – Tuesday, July 5, 7 a.m.: East stair tower and elevator will be closed. The west stair tower and elevator will remain in operation.

Friday, July 8, 7 a.m. – Monday, July 11, 7 a.m.: West stair tower and elevator will be closed. The east stair tower and elevator will remain in operation.

Website: http://pts.umich.edu/

RELATED STORIES